Calabash helped The All England Club prepare for The Wimbledon Championships

    We carried out the last minute suspended ceiling cleaning of the Royal Corridor on Centre Court at The All England Lawn Tennis and Croquet Club in Wimbledon.

    Project facts

    Surface: Metal ceiling tiles
    Size: 450m2 (corridors only)
    Height: 2.7 metres
    Duration: 2 out of hours visits
    Savings: 75% less cost than ceiling replacement
    Project integration: work completed out of hours, no shutdown period required
    Sustainability: Eco-friendly, non-toxic cleaning system, no building refurbishment waste