Suspended ceiling cleaning in St Helen’s Building, 1 Undershaft, The City of London

    Calabash complete a suspended ceiling clean on Level 4 of St Helen’s Building (Aviva Tower) in the City as we continue to save office fit-out companies up to 75% on their suspended ceiling refurbishment costs.

    The project included cleaning of all suspended ceiling tiles, ceiling grids, exterior of speakers, grilles and ventilation units. The work was carried out over 3 night visits to ensure no inconvenience to office employees, visitors and the refurbishment team on site.

    Client: ODB Group
    Ceiling type: Metal perforated suspended ceiling tiles
    Size: 1000 m2
    Height: 2.8 metres
    Duration: 3 visits
    Savings: 75% less cost than ceiling replacement
    Project integration: Quiet, mess-free operation, no office shutdown period required
    Sustainability: Eco-friendly, non-toxic cleaning system, no building refurbishment waste

    Having studied specialist suspended ceiling cleaning methods in America we have been cleaning suspended ceilings in the UK since 2007.

    Our clients have discovered Calabash suspended ceiling cleaning service can save them the cost of replacing ceiling tiles while helping them avoid the closure of their premises with our the work carried out quickly, safely and with minimal disruption.

    Take a look at some before & after and during the clean photos of our suspended ceiling cleaning work.

    If you have a ceiling cleaning project you would like to discuss or would like more information, please email admin@calabashgroup.co.uk or call us on 020 7371 9500 and we will get back to you shortly.