Calabash helped The All England Club prepare for The Wimbledon Championships

We carried out the last minute suspended ceiling cleaning of the Royal Corridor on Centre Court at The All England Lawn Tennis and Croquet Club in Wimbledon.

Project facts

Surface: Metal ceiling tiles
Size: 450m2 (corridors only)
Height: 2.7 metres
Duration: 2 out of hours visits
Savings: 75% less cost than ceiling replacement
Project integration: work completed out of hours, no shutdown period required
Sustainability: Eco-friendly, non-toxic cleaning system, no building refurbishment waste